Ticker

6/recent/ticker-posts

Costing run t code in sap | SAP- costing run t code| ck11n use for create cost estimate in sap

 

SAP Costing Run Transaction Codes - tcodesea

SAP Costing Run Transaction Codes: CK11N — Create costing run

Creating a Costing Run - tcodesea

SAP Create Costing Run Transaction Codes   Individual Processing

CK11N            Create material cost estimate

CK13N            Display costing run

CK24               Release costing run

CK33               Compare costing run

CKR1              Delete costing run


SAP costing run code - tcodesea


Costing run Individual Process

    Tcode                 CK11N

    Module                    Controlling

   Purpose                   Create Costing Run

   Product Cost Controlling















Menu Path    Use the following menu path to begin this transaction:

Accounting®Controlling® Product Cost Controlling® Product Cost Planning ® Material Costing ® Cost Estimate with Quantity Structure® Create CK11N


Overview

we create a standard cost estimate for material at the beginning of a fiscal year or a new period. The standard cost estimate then remains valid for the entire year or period. We may use it to establish a standard price for materials for the specific time period.

We should not altar the standard cost estimate during this time period. The standard costs then remain same and are not affected by price fluctuations or changes in the production structure during the planning period.

we value the planned quantity structure of a standard cost estimate with standard prices. A standard cost estimate for a material is not linked with an order or production version





When to start

At the start of the period to create the standard cost for the period of the material

Prerequisites

we create a cost estimate based on a costing variant. for standard cost estimates, the costing variant contains the following settings: The costing type indicate that the costing results can be updated to the material master as the standard price. The valuation variant specifies that the materials are valuated at the standard price or planned price


Post a Comment

1 Comments